KLEIN ISD- BASEBALL & SOFTBALL TURF CONVERSIONS
Turf Conversion
The conversion begins with the careful removal of existing grass and soil, followed by the installation of a robust drainage system to ensure optimal water management. Next, a sturdy base layer is laid, providing a stable foundation for the synthetic turf. Precision is key as the turf is expertly fitted and secured, incorporating features such as a perimeter curb and nailer board for durability. Advanced technology, including laser grading, ensures a perfectly level playing surface. Finally, the synthetic turf is meticulously groomed and infilled, resulting in a low-maintenance, high-performance field ready to withstand the demands of baseball season after season.
Client: Klein Independent School District
Architect: Texas-IBI Group, Inc.
General Contractor: ICI Construction
Completion Date: March 2024
Synthetic Softball Field
Synthetic Softball Field
Synthetic Turf Baseball Field Synthetic Turf Softball Field Synthetic Turf Football Field
Synthetic Softball Field