ALMETA CRAWFORD HIGH SCHOOL

Competition Field:

Installed Sub-drainage along with Geomembrane Liner. Once all base & finish rock was installed & laser graded the field was ready for turf install.


Track & Field Events:

For the running track we installed the ACO slot drain followed by the inside and outside concrete curbs. Then filled in the track with a Flex Base and laser graded. This was topped by 3” of Asphalt, and once cured the Beynon BSS200 Track Surfacing & Striping. Fielder’s Choice formed and installed the concrete pads and runways for the field events along with the equipment that goes with.


Practice Fields (2):

After the irrigation was installed, we put down root zone sand and laser graded in preparation for sod installation.

Tennis Courts:

Constructing a post-tensioned tennis court involves a specialized method that enhances the structural integrity and durability of the court surface.


Baseball & Softball Fields:

Installed Irrigation & Drainage system with a Geomembrane Liner. Installed nailer board to secure synthetic turf. Laser graded field in preparation for synthetic turf installation.

Client: Fort Bend Independent School District

Architect: Texas Sports & Civil Engineering

General Contractor: Durotech, Inc.

Completion Date: March 2023