top of page

PLANET FORD STADIUM

Synthetic Turf Football Field

 Formed field & stabilized. Installed nailer board for synthetic turf attachment. Supplied and installed drainage system along with a Geomembrane Liner. Installed aggregate drainage blanket over Liner. Laser graded field in preparation for synthetic turf installation.

Client: Spring Independent School District

Architect: PBK Architects

General Contractor: Durotech, Inc.

Completion Date: August 2019

bottom of page