CROSBY HIGH SCHOOL

Baseball & Softball Fields

(2 Competition & 2 Practice)
Fielder’s Choice performed the soil stabilization at Crosby first. Once stabilized we installed a perimeter curb from dugout to dugout followed by the nailer board. Supplied and installed drainage system along with the Geomembrane liner. Once all the base and finish rock was installed and laser graded the field was ready for turf installation.

Client: Crosby Independent School District

Architect: Cre8 Architects

General Contractor: Durotech, Inc.

Completion Date: April 2017